+ Ceiling Fixtures Fans Wall Fixtures Bathroom Outdoor Directional Lights Home Decor Hot Deals Chandeliers Indoor Chandeliers Outdoor Chandeliers Flush Mounts Bowl Flush Mounts Cage Flush Mounts Drum Shade Flush Mounts Outdoor Flush Mounts Pendants Down Pendants Up Pendants Drum Shade Pendants Multi-Point Pendants Track Lighting Belt Fans Huggers Ceiling Fans Wall Fans Fandeliers Outdoor Fans Sconces Picture Lights Lit Mirrors Sconces Vanity Lights Pendants Deck Lights Pier Mounts Wall Lanterns Posts Hanging Lanterns / Chandeliers Landscape Floor Lamps Table Lamps
Hi, Sign In | Create Account Locations & Hours
Account Edit Account Account Information Default Billing Default Delivery User Name & Password Contacts Wishlists
+ Create A New Wishlist
Home About Us Contact Us Policies Shipping Policy Privacy Policy Return Policy Terms & Conditions [email protected]

Copyright @ 2024 Alveraan Inc. All rights reserved.
Part Number: 9ZPH8 / Vendor ID #: 75
Pre-Bent S Curve MonoRail
$325.50
Availability
  • Manufacturer availability unknown.
Dimensions
Height: 0.60"
Width: 0.30"
Finish: Antique Bronze
Item Color 1: Brown
Master Color: Brown
Product Overview
BROWN MO HORIZ. S-CURVE ANT.B
Standard Information
Category:
Track Ltg.
Subcategory:
Track Accessories
Finish:
Bronze
Style:
Contemporary
Option:
Title 20
Refinement Options
Category:
Monorail Hardware
Finish:
Antique Bronze
Style:
Contemporary | Modern
Option:
Dry Rated
Bulb Dimmable:
False
Introduction Date:
01/01/2005
Ship Carton Height:
6.00
Ship Weight:
3
Special Features:
From the brand formerly known as Tech Lighting
Vendor Ship Method:
UPS Fedex
Warranty:
1 Year
Weight:
1.10
24 Volt:
False
Adjustable Head:
False
Cable Field Cuttable:
True
Cannot Ship To California:
False
Cannot Ship To Canada:
False
Damp Rated:
False
Dark Sky:
False
Dry Rated:
False
FWC Compliant:
False
Integrated LED:
False
Item Color 1:
Brown
Master Color:
Brown
Motion Sensor Included:
False
Photocell Included:
False
Replaceable Lamp:
False
Reversible:
False
Safety Rating:
ETL
Shape:
Pre-bent S-curve
Sloped Ceiling Compatible:
False
Solar Powered:
False
SORAA:
False
Stocking Type:
Made to Order
System:
MonoRail
Title 20:
False
Title 24:
False
Transformer Required:
False
Warm Color Dimming:
FALSE
WET IP65:
False
Wet Rated:
False